【Shanghai Tower Project Temporary Office Building Transformation Design】

  • Owner:Shanghai Tower Construction& Development Co., Ltd.

  • Location:Shanghai China

  • Area:2,360sqm

  • Function:Office

  • Date:2008

  • Status:Completed



How to make a common space generate positive change, and then radiates new dramatic performance, under strong intervention of the external condition, is the issue of the design. Following Cartesian perspective system principle, adopting the linear adjustment of the interface, the design achieves the strong visual effect of deepening the fluoroscopy. And the sequence of steel columns, make the feeling of entering focus on the huge display models.